Contact & project planning

Start with the rink.Then shape the system.

Every installation begins with the facility's existing water flow, operating routine, and priorities. A focused first conversation gives Lex Aqua the context to evaluate the right recovery approach.

Coverage North America + Europe
Project type New + existing rinks
Lex Aqua treatment system and connected arena piping in an operating equipment room
Project conversations Grounded in the room behind the rink.
Lex Aqua Project planning

A simple place to begin

Start with an Operational Efficiency Review.

Not every conversation needs to begin with a full system proposal. Lex Aqua can first review the rink you already operate, identify practical opportunities, and organize the findings into a clear facility-specific summary.

Request an efficiency review No formal engineering package is needed to start.
Lex Aqua Ice Rink Operational Efficiency Review
01 Ice conditions
02 Ice resurfacing
03 Water use & quality
04 Zamboni maintenance
05 Labor & daily operations
06 Controls, monitoring & data
What you receive
1 Prioritized findings
2 Recommended actions
3 Estimated impact

Schedule a conversation

Book 30 minutes with Kevin.

Choose a time that works for you. Availability is connected directly to Kevin Trindl’s Lex Aqua calendar, so you can schedule without the back-and-forth.

Prefer to open the scheduler in its own window? Book a 30-minute meeting
Kevin Trindl — 30 minute meeting
Live availability via Microsoft Bookings

Regional contacts

Speak with the right team.

Choose the contact responsible for your region. Include basic rink details in your message so the conversation can begin with useful context.

What to send us

Four details are enough to start.

A few photos and basic operating details give us enough context for the first review.

Helpful attachment Photos of the melting pit, equipment room, and resurfacer fill area
01
Facility

Rink location and number of ice sheets

02
Water flow

Melting pit, storage, and resurfacer routine

03
Operation

Resurfacing schedule and current water use

04
Priority

The outcome your facility cares about most

Begin the conversation

A better water loop begins with the rink you already operate.

United States + Canada ktrindl@lexaqua.com Lex Aqua project inquiries